Proposed Keeneland racetrack property

January 19, 2015
A 149-acre site located off the Corbin Bypass in the Tri-County Industrial Park is in the running for a possible quarter horse track.

A 149-acre site located off the Corbin Bypass in the Tri-County Industrial Park is in the running for a possible quarter horse track.


Photos by Bobbie Poynter

The area is located approximately two miles south on the Bypass from  KY 25E at the intersection of Buchanan and the Old Barbourville Highway.

The area is located approximately two miles south on the Bypass from KY 25E at the intersection of Buchanan and the Old Barbourville Highway.